In accordance with AS 4100, the length of the bolt shall be at least one clear thread above the nut.
The photo shows an unacceptable installation of the nuts as the threads are too short and are not one clear thread past the nut.
NCC 2022, effective from May 2023, revised shower floor grading to be minimum 1:80 to maximum 1:50. This applies to all States and is irrespective…
HIA has issued advice regarding the changes to branch drain connections in the revised NCC 2022. For further information, see the link below:…
Brisbane City Council has now published further information about changes to siting variations which can be found at: https://www.brisbane.qld.gov.au/planning-and-building/do-i-need-approval/types-of-approval/building-near-the-boundary